7. Operation/decommissioning and disposal
Device settings
)See Chapter 6.3.8
In this menu, the display properties of the
screen, such as backlight and contrast, can
be modified. The date and time are also set
here.
Pump 1 Timings
)See Chapter 6.3.9
In this menu, the timing of the pump and
the settings for the associated main line
are set
Information
)See Chapter 6.3.12
The hardware and firmware versions
are stored in this menu. The hours of
controller operation, the error history, and
the serial number of the LMC 301 can also
be viewed here.
EN
7.2 Temporary shutdown
Temporary shutdown is performed by
disconnecting the electrical supply
connections.Observe the instructions in the
chapter “Assembly” while doing so.
If the product is to be shut down for an
extended period of time, also follow the
instructions in Chapter “Transport, delivery,
and storage.”
77
7
7.4 Shutdown and disposal
If the product is to be shut down perma-
nently, observe the legal requirements for
disposal of contaminated parts/equipment.
The product can also be returned to SKF
Lubrication Systems Germany GmbH for
disposal, in which case the customer is
responsible for reimbursing the costs
incurred.
The parts are recyclable.
After a brief down time:
o Check the supply voltage - green POWER
LED must light up
o Perform visual inspection
o Switch on the product
After extended down time:
o Perform safety checks
o Trained maintenance personnel inspect/
replace the button cell battery
- see Maintenance chapter
o Check the supply voltage - solid green
POWER LED
7.3 Recommissioning
IMPORTANT NOTE
Observe the local regulations and
laws regarding disposal.
o Perform visual inspection
o Switch on the product