EasyManua.ls Logo

Strautmann Verti Mix Double K - Crossover Conveyor, Discharge Conveyor or Conveyor Extension; Check the Conveyor for Visible Defects

Default Icon
187 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Machine maintenance and care
11.9 Crossover conveyor, discharge conveyor or conveyor extension
Check the tension of the respective conveyor before each start-
up.
A wrong tension may cause damage to the conveyor.
Straighten the conveyor by means of the clamping screws
(Fig. 95/2) if the conveyor is not running straight or is rubbing
along the frame.
Clean the driving, supporting and guide rollers if fodder residues
have piled up on the rollers.
Lubricate the 4 flanged bearings of the conveyor at least every
25 service hours.
A properly tightened conveyor sags by approx. 10 to 15 mm in
the centre. Consider the ambient temperature. Low
temperatures shorten the conveyor, high temperatures lengthen
it.
11.9.1 Check the conveyor for visible defects
Check the conveyor (1) and the belt fastener (2)
of the respective conveyor weekly for visible
defects. Replace the conveyor in case of
damage (fissures, raised corners).
Fig. 94
Verti Mix Double K Edition
167
08.08

Table of Contents

Related product manuals