CAUTION
Beware of the cable if the blow-out pipe is equipped with an
electrical adjusting system for the ejection hood.
6. Swivel the blow-out pipe aside.
7. Empty the blow-out pipe or the blower casing.
8. Open the cover (Fig. 39/3) at the blower casing, in order to
remove e.g. stones from the blower casing.
9. Screw the blow-out pipe and the cover to the blower casing
according to (Fig. 39) before switching on the blower.