Turn the power on, while pressing the LEFT key and the
READY key simultaneously. Then the initialization message
shows up on the screen, while the sewing and motor-related
parameters are initialized to default values.
When the initiation is completed, the initial logo is displayed
on the screen (in case of BH6100-01).
6-14) Initialization
Turn the power on, while pressing the LEFT key and the
RIGHT key simultaneously. The machine moves to the
original point, and the buzzer goes off. The testing message
shows up on the screen.
In a second, the screen automatically switches to the test menu.
‘1’ flickers on the screen.
1. Jog XYZ : Step motor test
2. Sol. : Thread tension solenoid test
3. M.Motor : Main motor test
4. PulyPos : Pulley position test
5. Synchro : Synchro test
6. Pedal : Pedal input test
7. Aux.Out : Auxiliary output test
8. Aux.In : Auxiliary input test
6-15) Machine testing functions
(hold on)
+
(hold on)
+
(hold on)
+
“Power ON”
(hold on)
+
“Power ON”
BH6100-01

Table of Contents