EasyManua.ls Logo

Wacker Neuson WL 30 - Page 141

Wacker Neuson WL 30
246 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
S E R V I C I N G A N D I N S PE C T I O N
139
W L 3 0
Weekly servicing
Perform the following tasks:
• Clean fuel lter for the presettling reservoir (if present)
• Check axles for leaks
•
Check hydraulic uid cooler and water radiator for leaks
and dirt
• Check exterior condition of the radiators, i.e. the hoses
• Check the tension and condition of the fan belt
• Check the acid level of the battery
• Check the attachments
• Check the piston rods for the hydraulic cylinders
• Check the routing of the hoses and pipes
• Check the air lter hose
•
Check the routing of the electrical wiring (rubbing/dam-
age)
• Oil lubrication for all the levers
• Oil lubrication for all the cables and hinges
• Retighten all the screws
•
Observe in particular the engine suspension and the
axle mounting
• Perform the general safety check

Table of Contents