EasyManua.ls Logo

Wacker Neuson WL 30

Wacker Neuson WL 30
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
S A F E T Y I NS T R U C TI O N S F O R R EPA I R S
224
Before performing welding work on the loader
Disconnect the battery as described in this Operators
Manual.
Disconnect the positive pole (terminal B+) on the gen-
erator.
Switch OFF the battery disconnect switch (if present).
Protect bare terminals and connections against short-
circuiting.
Attach the welding grounding terminal in the immedi-
ate vicinity of the welding site. Do not allow the welding
current to pass through gears, bolts, articulated joints
or hydraulic cylinders.
After welding has been completed:
Reconnect all the electrical connections and check that
they function.
Connect the battery as described in this Operators
Manual.

Table of Contents

Related product manuals