Proprietary & Confidential. All rights strictly reserved. Reproduction or issue to third parties in any form is not permitted without written authority from ABB.
/
A3
Size
Sheet
HLA
Location
Title
Drawing No.
Revision
Issue
Modified
Elec. Eng. approval
Mfg. approval
2
5
URC.V3QEU.1
AC
2021/03/08
2021/06/28
2021/06/15
SR
MM
OO
Line
Load
d
I
Line
Load
d
I
L1
L2
L3
12
11
14
PEN
4321
L1
L2
L3
12
11
14
PEN
4321 4321
PE
-X400
-X402
-DC
+DC
-X10
-X8
POWER
CABINET
-X324
AC Main Grid
PE
-X10
-X8
POWER
CABINET
-X324
PE
-X400
-X402
-DC
+DC
-X10
-X20
CHARGE
POST
SECONDARY
PRIMARY
CONDUIT
CONDUIT
2.5mm² GY
2.5mm² BK
2.5mm² BN
2.5mm² GN/YE
Refer to next page "Signal connection Charge Cabinet-Charge"
Refer to next page "Signal connection Charge Cabinet-Charge"
CONDUIT
TWO POWER CABINET AND ONE CHARGE POST
PROJECT NAME: 3Q38 ELECTRICAL CONNECTIONS
(PARALLELING ON POWER CABINET PRIMARY)
if needed
Local eart
if needed
Local eart
if needed
Local eart
+DC
-X402
-X400
-DC
DC+ 1x185mm² double connection
Legend:
DC- 1x185mm² double connection
PE 35mm²
CONDUIT