ABB HP CP500 - Prepare a Custom Foundation for the Power Cabinet

ABB HP CP500
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
1. Contact the manufacturer to order the
foundation for your EVSE. Refer to
section 1.12.
2. Dig the hole for the foundation.
Caution: Make sure that the
top surface of the
foundation is above the
ground level, to prevent
intrusion of water.
3. Guide the cable conduits into the
holes of the foundations:
Holes (A): CAN, interlock and DC
guard or AC auxiliary power and PE
cables
Holes (B): DC or AC power cables
4. Install the foundation in the hole.
5. Pull the cables through the cable conduits in the foundation. Apply the full cable
slack.
For the specification of the cable slack, refer to section 12.15.1.
6. Fill the foundation with gravel or another substance to prevent rodents to enter
the cabinet.
4.4.3 Prepare a custom foundation for the power cabinet
Preliminary requirements
Custom foundation. Refer to section 12.17.2.
Procedure
1. Make the custom foundation.
Caution: Make sure that the
top surface of the
foundation is above the
ground level, to prevent
intrusion of water.
2. Guide the cables into the holes (C1) to
(C7) of the foundations. For the
relation between the cables and the
holes, refer to section 12.17.2.
3. Install the foundation in the hole.
4. Put the cables through the openings in
the foundation. Apply the full cable
slack.
For the cable slack, refer to section 12.15.
5. Fill the foundation with gravel or another substance to prevent rodents to enter
the cabinet.
A
BB
C2C1 C5
C6
C7
C3
C4
Pre-installation
9AKK107992A6488-EN | 004 29