Parameter Specification
Eye bolts to hoist the charge post M10, 45 mm (1 3/8 in)
Caps to replace the eye bolts after trans-
port of the charge post
To fit in the holes for the eye bolts
Note: It is possible that more parts are required in the delivery. Refer to
the order.
12.3 Required tools for installation
Parameter
Specification
Hoisting equipment or forklift truck Capable to lift the EVSE safely. Take into
account the dimensions, the mass, and
the center of gravity.
Swivel eye bolts or bolts with lifting
loops (to use with hoisting equipment)
As a standard, eye bolts are installed on
the cabinets. Refer to section 12.2.
Thread M10 for the charge post
Thread M16 for the power cabinet
Bolts Size M16
Hex keys Standard set of hex keys
Open spanners Standard set of open spanners
Torque socket wrench For the torque specifications, refer to
section 12.14.
Screwdriver, cross Size M5 (8 mm (0.3 in))
Wire cutter -
Wire stripper pliers -
Crimp pliers -
12.4 Required parts for installation
Part
Specification
Fasteners and washers, to connect the
charge post to the foundation
M12, class A2, length 70 mm (2.75 in)
Fasteners and washers, to connect the
power cabinet to the foundation
M16, class A2, length 70 mm (2.75 in)
Fasteners and washers, for the earthing
connections
M11, class A2, length 70 mm (2.75 in)
Table 1: Cable lugs
Location
Wire Size Maximum width Maximum length
[mm] [in] [mm] [in]
Power
cabinet
PE M12 35 1.4 70 2.7
M10 25 70 50 70
Technical data