Check the o-rings and sealings in the front ear of the balancing device for leaks.
xx1000000207
ShaftA
Sealing ring (radial (2 pcs)B
O-ringC
Sealing spacerD
NoteAction
Clean the area at the front ear from contamina-
tion.
1
Run the robot for some minutes, in order to
move the balancing device piston.
2
DANGER
Turn off all:
• electric power supply to the robot
• hydraulic pressure supply to the robot
Before entering the robot working area.
3
Check the o-rings at the front ear for leakage.4
The o-rings are included in the Main-
tenance kit, bearings and seals
already assembled with sealing
spacers and sealing rings. Art. no. for
the kit is specified in Required equip-
ment on page 145.
Replace o-rings if leaks are detected.5
Replacement of the complete bearing
is also described in section Replace-
ment of spherical roller bearing, balan-
cing device on page 297.
Continues on next page
148 Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
3 Maintenance
3.3.7 Inspecting the balancing device
Continued