3.6.2 Rust preventive measures, bearing axis 1 (Foundry Prime)
Location of bearing axis 1
The bearing axis 1 is located as shown in the illustration. (View from above).
xx0700000445
Cable guideA
Required equipment
NoteArt. no.Equipment
-Brush
Continues on next page
198 Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
3 Maintenance
3.6.2 Rust preventive measures, bearing axis 1 (Foundry Prime)