EasyManua.ls Logo

ABB IRB 6640 Foundry Prime - Page 225

ABB IRB 6640 Foundry Prime
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the cable harness - upper arm
Use this procedure to remove the cable harness from the upper arm of the robot.
NoteAction
Axes 2 and 3 may be tilted slightly to
improve access.
In order to facilitate refitting of the cable har-
ness, run the robot to the specified position:
Axis 1: 0 °
Axis 2: 0 °
Axis 3: 0 °
Axis 4: 0 °
Axis 5: +90 °
Axis 6: no significance
1
DANGER
Turn off all:
electric power supply to the robot
hydraulic pressure supply to the robot
Before entering the robot working area.
2
CAUTION
Always cut the paint with a knife and grind the
paint edge when disassembling parts. See Cut
the paint or surface on the robot before repla-
cing parts on page 219.
3
xx0200000214
Remove the cover, wrist unit and the cover,
upper arm tube.
4
A Cover, wrist unit
B Cover, upper arm tube
Note
Axis 5 must be oriented in the correct position
(+90º) to allow the motor 6 cover to open!
5
Remove the cover of motor, axis 6 and discon-
nect all connectors beneath.
6
Continues on next page
Product manual - IRB 6640 Foundry Prime 225
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.3.1 Replacing cable harness, axes 1-6
Continued

Table of Contents

Related product manuals