Refitting protection pipe and cable guide - Foundry Prime
Use this procedure to install the protection pipe and cable guide on Foundry Prime
robots.
NoteAction
xx1000000331
Check that the protection pipe is temporarily
installed as shown in the figure.
This is important to be able to use the press
tool when installing the sealing ring.
1
• A: Upper edge of center tube
• B: Upper edge of the protection
pipe
• C: About 30 mm
xx1000000365
Lubricate the surfaces of the center tube
with grease as shown in the figure.
2
• A: Surfaces to be lubricated with
grease
• B: Center tube
For art. no. see:
• Required equipment on page 388
xx1000000366
Install the sealing ring with the press tool.
Use a plastic mallet.
3
• A: Plastic mallet
• B: Press tool
Continues on next page
Product manual - IRB 6640 Foundry Prime 401
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.7.1 Replacing gearbox axis 1
Continued