EasyManua.ls Logo

BD FACSCanto - Page 134

BD FACSCanto
184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
134 BD High Throughput Sampler User’s Guide
Figure 4-18 HTS sheath and waste lines
6 Connect the purging assembly line to the Sheath (B) port.
The purging assembly line is located in the spares kit.
7 Put the end of the purging assembly line into a 500-mL beaker containing
DI water.
8 Put the safety cover on the HTS.
filter
BD HTS sheath line
sheath connector
purging assembly line
beaker of DI water
Sheath (B) connector in port

Table of Contents

Other manuals for BD FACSCanto

Related product manuals