EasyManua.ls Logo

BD FACSCanto - Reinitializing the HTS; Inspecting Thumbscrew Fittings

BD FACSCanto
184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
142 BD High Throughput Sampler User’s Guide
Reinitializing the HTS
If you switch off the HTS, and then switch it back on again while the software is
running, you must reinitialize the HTS.
1 Choose HTS > Reinitialize.
The following message appears when reinitialization is complete.
2 Click OK to dismiss the message.
Inspecting Thumbscrew Fittings
Thumbscrew fittings are installed in the following tubing locations. Check and
tighten these thumbscrews periodically, and replace them when needed.
Primary pump valve to probe—There are male thumbscrew fittings at both
ends of the tubing.
Sample injection tubing—There is a male thumbscrew fitting at the sample
injection port/wash station and a female thumbscrew fitting at the
extension tubing to the secondary pump valve.
Extension tubing to the secondary pump valve—There is a male
thumbscrew fitting at the sample injection tubing end.
All cytometer surfaces that come in contact with biological specimens can
transmit potentially fatal disease. Use universal precautions when handling
cytometer components. Wear suitable protective clothing, eyewear, and
gloves.

Table of Contents

Other manuals for BD FACSCanto

Related product manuals