EasyManua.ls Logo

Cisco ONS 15454 - DLP-G17 Connect Office Power to the ONS 15454 ETSI

Cisco ONS 15454
516 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Stop. You have completed this procedure.
DLP-G17 Connect Office Power to the ONS 15454 ETSI
This task connects power to the ONS 15454 ETSI shelf.Purpose
#2 Phillips Dynamometric screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
Wire cutters
Wire strippers
Crimp tool
Fuse panel
Power cable (from fuse and alarm panel to assembly), 5.26-mm² (#10 AWG),
copper conductors, 194 degrees F [90 degrees C])
Ground cable 13.3-mm² (#6 AWG) stranded
Listed pressure terminal connectors such as ring and fork types; connectors must
be suitable for 5.26-mm² (#10 AWG) copper conductors
Tools/Equipment
Connect the chassis to the office ground. For detailed instructions on how to
ground the chassis, refer to the Electrostatic Discharge and Grounding Guide for
Cisco CPT and Cisco ONS Platforms.
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
When installing or replacing the unit, the ground connection must always be made first and disconnected
last. Statement 1046
Warning
Do not apply power to the ONS 15454 ETSI until you complete all installation steps and check the continuity
of the –48 VDC battery and battery return.
Caution
No more than 2 m (7 ft) of the power supply cable should be exposed between the equipment and the
fiber-storage tray.
Note
Cisco ONS 15454 Hardware Installation Guide
70
Installing the ONS 15454 M12 (ANSI and ETSI) Shelf
DLP-G17 Connect Office Power to the ONS 15454 ETSI

Table of Contents

Other manuals for Cisco ONS 15454

Related product manuals