During the system startup or fan-tray replacement, the inventory data of the fan-tray assembly and the power
module is displayed in the Inventory tab of CTC after a delay of approximately 6 minutes.
Note
Procedure
Step 1 Complete the necessary task as applicable:
• DLP-G592 Install the AC Power Module in the ONS 15454 M2 Shelf, on page 231
• DLP-G593 Install the DC Power Module in the ONS 15454 M2 Shelf, on page 233
Step 2 Complete the NTP-G271 Install the Power and Ground to the ONS 15454 M2 Shelf, on page 239.
Stop. You have completed this procedure.
DLP-G592 Install the AC Power Module in the ONS 15454 M2 Shelf
This procedure installs the AC power module in the ONS 15454 M2 system.Purpose
#2 Phillips screwdriverTools/Equipment
• NTP-G266 Install the ONS 15454 M2 Shelf, on page 194.
• Connect the chassis to the office ground. For detailed instructions on how
to ground the chassis, refer to the Electrostatic Discharge and Grounding
Guide for Cisco CPT and Cisco ONS Platforms .
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Procedure
Step 1 Insert the AC power module in Slot A.
Cisco ONS 15454 Hardware Installation Guide
231
Installing the ONS 15454 M2 Shelf
DLP-G592 Install the AC Power Module in the ONS 15454 M2 Shelf