Procedure
Step 1 The fiber patch-panel tray requires 1 to 2 RUs of space in a standard 19-inch (482.6-mm) or 23-inch (584.2-mm)
rack, depending on whether you are installing a standard or deep patch-panel tray. (The standard tray requires
1 RU, and the deep 32-channel, 40-channel, and mesh patch panel trays each require 2 RUs.) Locate the RMU
space specified in your site plan.
Step 2 Verify that the mounting brackets attached to the unit are correct for your rack size. Complete DLP-G3 Reverse
the Mounting Bracket to Fit a 19-inch (482.6-mm) Rack (ANSI Only), on page 33 as required.
Step 3 Align the tray chassis with the rack mounting screw holes, then insert and tighten the four screws.
Step 4 Connect a frame ground to the ground terminal provided on either side of the chassis. Use minimum #14
AWG wire.
Step 5 Repeat Steps 2 through 4 for each patch-panel tray you want to install.
Step 6 Return to your originating procedure (NTP).
DLP-G29 Install the Fiber-Storage Tray
This task installs the fiber-storage tray. The fiber-storage tray stores slack
fiber-optic cable.
Purpose
#2 Phillips Dynamometric screwdriverTools/Equipment
NonePrerequisite Procedures
As neededRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Procedure
Step 1 The fiber-storage tray requires 1 RU in a standard 19-inch (482.6-mm) or 23-inch (584.2-mm) rack. Locate
the RMU space specified in your site plan.
Step 2 Verify that the mounting brackets attached to the unit are correct for your rack size. Complete the DLP-G3
Reverse the Mounting Bracket to Fit a 19-inch (482.6-mm) Rack (ANSI Only), on page 33 as required.
Step 3 Align the chassis with the rack mounting screw holes, insert the four screws, and tighten.
Step 4 Return to your originating procedure (NTP).
Cisco ONS 15454 Hardware Installation Guide
125
Installing the ONS 15454 M12 (ANSI and ETSI) Shelf
DLP-G29 Install the Fiber-Storage Tray