EasyManua.ls Logo

Cisco ONS 15454 - DLP-G598 Connect Office Power (DC) to the ONS 15454 M2 Shelf (ETSI Only)

Cisco ONS 15454
516 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Before you make any crimp connections, coat all bare conductors (battery, battery return, and frame
ground) with an appropriate antioxidant compound. Bring all unplated connectors, braided strap,
and bus bars to a bright finish, then coat with an antioxidant before you connect them. You do not
need to prepare tinned, solder-plated, or silver-plated connectors and other plated connection surfaces,
but always keep them clean and free of contaminants.
Caution
When terminating power, return (RET), and frame ground, do not use soldering lug, screwless
(push-in) connectors, quick-connect, or other friction-fit connectors.
Caution
Step 12 Return to your originating procedure (NTP).
DLP-G598 Connect Office Power (DC) to the ONS 15454 M2 Shelf (ETSI Only)
This task connects power to the ONS 15454 M2 shelf (ETSI Only).Purpose
#2 Phillips Dynamometric screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
Wire cutters
Wire strippers
Crimp tool
Fuse panel
Ground cable #6 AWG stranded. The PID of the DC power cable for ETSI
left exit is 15454-M2-DCCBL-LE=.
Tools/Equipment
NTP-G266 Install the ONS 15454 M2 Shelf, on page 194.
Connect the chassis to the office ground. For detailed instructions on how
to ground the chassis, refer to the Electrostatic Discharge and Grounding
Guide for Cisco CPT and Cisco ONS Platforms .
NTP-G270 Open and Remove the Standard Door of the ONS 15454 M2
Shelf, on page 218.
NTP-G267 Install the Power Module in the ONS 15454 M2 Shelf, on page
230.
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
When installing or replacing the unit, the ground connection must always be made first and disconnected
last. Statement 1046
Warning
Cisco ONS 15454 Hardware Installation Guide
249
Installing the ONS 15454 M2 Shelf
DLP-G598 Connect Office Power (DC) to the ONS 15454 M2 Shelf (ETSI Only)

Table of Contents

Other manuals for Cisco ONS 15454

Related product manuals