EasyManua.ls Logo

Cisco ONS 15454 - Page 357

Cisco ONS 15454
516 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 223: Closing the Standard Door of the ONS 15454 M6 Shelf
Stop. You have completed this procedure.
NTP-G259Openand Removethe StandardDoorof theONS 15454
M6 Shelf
This procedure opens and removes the standard door of the ONS 15454 M6 shelf.Purpose
#2 Phillips Dynamometric screwdriverTools/Equipment
NTP-G252 Install the ONS 15454 M6 Shelf , on page 294
Connect the chassis to the office ground. For detailed instructions on how
to ground the chassis, see the Electrostatic Discharge and Grounding Guide
for Cisco CPT and Cisco ONS Platforms.
Prerequisite Procedures
RequiredRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Procedure
Step 1 Complete the DLP-G576 Open the Standard Door of the ONS 15454 M6 Shelf , on page 328.
Cisco ONS 15454 Hardware Installation Guide
327
Installing the ONS 15454 M6 Shelf
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf

Table of Contents

Other manuals for Cisco ONS 15454

Related product manuals