Section 2: Installation and Removal 3033-002B
2-8 Concordia Xpress Technical Support Manual
2900-300B
Additional Tasks Required at Installation
Power Up the Machine
1. Close both tank drain valves
2. Ensure the electrical cord is plugged in and twist-locked
3. Ensure water is supplied to unit
4. Ensure a drain is connected to the unit
5. Start the unit by turning on the main power switch located behind
the grounds bin door
6. Warm-up will take 10-15 minutes
NOTE: The grounds bin must be in place and all doors must be
closed.
Install Bean Hoppers
1. Install the bean hoppers.
2. Fill the bean hoppers with fresh, whole, espresso roast beans.
For information on the bean hoppers, please see Section 6:
Coffee System.
IMPORTANT: Ensure the hopper stoppers are removed, so that the
beans can be delivered to the grinder.
Install Cup Stand (Optional)
Install the cup stand beneath the product outlet.
Operational Configuration
The Xpress is configured with a default recipe. However, it may still be
necessary to make minor adjustments to the grinder settings or milk
levels, depending on an existing customer recipe or customer
preference. For instructions on calibrating the grinder, please see
Section 6: Coffee System, and for instructions on adjusting the milk
levels, please see the Calibration topic in Section 4: Software. For
instructions on adjusting flavor timings, please see Section 9: Flavor
System.
At this time, set the time and date, using the software menu in the
machine. Please see Section 4: Software for detailed instructions on
accessing and using the TIME & DATE menu.
Placing Milk in the Refrigeration Unit
Place two gallons of milk in the upper refrigeration unit. Non-fat milk is
placed in the rear position and regular milk (whole or 2%) in the front.