3033-002B Section 2: Installation and Removal
Concordia Xpress Technical Support Manual 2-9
2900-300B
Machine Calibration
The calibration process is the same regardless if the setup includes the
default recipe, or if it includes a customer-specific recipe.
To ensure the machine is properly calibrated, verify the following:
1. Water Pump Pressure
2. Espresso Extraction Times
3. Drink Temperatures
4. Drink Levels
5. Syrup Volumes
6. Taste Profile
If necessary, adjust the bean grind to achieve the appropriate extraction
times.
Customer Training
Complete customer training is required at the time of installation. Refer to
Section 12: Concordia Procedures, for complete instructions.
Customer Training Includes:
How to turn machine on/off
How to refill milk supply, bean hoppers, consumables
How to select drinks and drink options
Show location of serial number
How to clean the machine (including cleaning cards)
How to change flavor boxes
How to empty the grounds bin
Installation Checklist
The installation checklist (PN 6000-075) must be completed and faxed to
Concordia within 24 hours of installation.
Removal Procedures
Prepare and package machine and components following the procedure
described in the Concordia Shipping Kit (PN 2900-142).
1. Record the drink GRAND TOTAL on the service invoice.
2. Record the machine serial number.
3. Clean the grinders.
4. Clean the brew group.
5. Run the daily clean cycle (brew group and milk system clean
processes).
6. Clean the refrigeration unit.
7. Clean the flavor delivery system.

Table of Contents