EasyManua.ls Logo

D-Link DWL-6600AP

D-Link DWL-6600AP
754 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Configuring Multiple Spanning Tree Protocol
D-Link Unified Wired and Wireless Access System
Oct. 2015 Page 684
D-Link UWS User Manual
8. Use similar procedures to enable on port 0/2.
9. Force port 0/2 to be the root port for MST 20, which is the non-root bridge.
a. Go to the LAN > L2 Features > Spanning Tree > MST Port Configuration/Status page.
b. From the MST ID menu, select 20.
c. From the Slot/Port menu, select 0/2.
d. In the Port Priority field, enter 64.
e. Click Submit.

Table of Contents

Other manuals for D-Link DWL-6600AP

Related product manuals