EasyManua.ls Logo

Dover DMM-0200 - Customer Responsibilities; Requirements for the Installation Site; Preliminary Steps

Dover DMM-0200
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 14 of 112
DMM-0200 Product User Guide
159 Swanson Road
Boxborough, MA 01719
Tel: 508-475-3400
Email: sales@dovermotion.com
Customer Responsibilities
Requirements for the Installation Site
For installation of the DMM-0200, you are responsible for supplying the following:
An electrical receptacle available for power to the system. SeeElectrical Receptacle” on page 16 for
specifications.
Warning: If you use a different type of power cord, plug, or receptacle, other than those
specified in the guide, you are responsible for having a qualified electrician install them.
Warning: If the system voltage is different than what is specified in the guide, you are
responsible for having a qualified electrician rewire the system power supplies PWS1-4 and
the main transformer T1 for that voltage.
A suitable bench area for the DMM-0200. See bench specifications in the Table 1.
One 2.0 USB cables (optional).
Note: The USB cable is not required for the initial installation since the system software is
already installed on the DMM-0200 when shipped. This cable is for customer use.
Preliminary Steps
Perform the following preliminary steps to prepare for the installation:
1. Complete the Site Requirements Checklist. See Site Requirements section.
Note: Do not attempt to perform an installation unless the requirements specified in this guide
have been carried out.

Table of Contents

Related product manuals