Above Ground Model 200iX/250iX Motorcycle Dynamometer Installation Guide
Index-ii
status indicator 4-4
wheel clamp 4-4, 4-7
control panel cable 2-34
control panel interface
basic operation 4-3–4-8
conventions 1-3
coupler 2-20
crate
removing the dyno 2-10
unpacking eddy current brake 2-15
unpacking iX dyno 2-25
unpacking iXW dyno E-5
unpacking the dyno 2-2
D
dimensions 1-6, E-3
disclaimers vii
document part number 1-1
drill and drill bit requirements 1-9
driveline
eddy current brake 2-20
iX drum module 2-27
iXW drum module E-8
drum guards, adjusting ce C-4
drum safety cover 2-43, C-2, E-17
dyno
height 1-5, E-2
length 1-5, E-2
secure to floor 2-23
weight 1-5, E-2
width 1-5, E-2
dyno covers, installing
center cover, dyno 2-41, E-15
center cover, iX dyno 2-42
drum safety cover 2-43, E-17
left cover, iXW dyno E-16
right cover, iXW dyno E-16
side cover, drum 2-31, E-13
side cover, dyno 2-30, E-12
side cover, eddy current brake 2-40, E-14
top cover, dyno 2-31, E-13
top cover, dyno drum 2-41, E-15
top cover, eddy current brake 2-41, E-15
top cover, iX drum 2-42
top cover, iXW drum E-16
dyno covers, removing
side cover, dyno 2-24
top cover, dyno 2-24
dyno power 2-53, 3-2
main circuit breaker 2-53, 3-2
dyno room
1-4
equalizer box 1-4
exhaust extraction 1-4
fire suppression 1-4
intake air fan 1-4
noise control 1-4
dyno shutdown 4-4, 4-5
dyno shutdown sticker 3-7
DynoWare RT
installing 2-34
module connections 1-12
network connections 1-13
overview 1-11
power cable 2-32
E
eddy current brake
coupler 2-20
driveline 2-20
eddy current brake driver fuses 4-11
installing 2-19
IR temp sensor cable 2-33
secure to floor 2-23
side cover 2-40, E-14
top cover 2-41, E-15
unpacking 2-15
eddy current brake driver
replace fuses 4-11
routing cable 2-33
electrostatic discharge viii
emergency stop 4-4, 4-5
sticker 3-5
environmental requirements 1-9
equalizer box 1-4
ESD precautions viii
e-stop cable 2-33
exhaust extraction 1-4
extended carriage 3-17
extension support 3-19
extension support brace 3-18
installing 3-21
extension support 3-19
extension support brace 3-18
F
fan arm mount 2-44, 2-49
final adjustments and tests 3-30
fire suppression 1-4
forklift requirements 1-9
front bulkhead 2-29, E-11
fuses
eddy current brake driver 4-11
power distribution assembly 4-12
G
grade 10.9 torque values F-4
grade 5 torque values F-2
grade 8 torque values F-3
grade 8.8 torque values F-4
ground hooks 1-9, E-18
installing 2-56
grounding bracket 5-8
grounding requirements 1-10, 5-8