EasyManua.ls Logo

Dynojet 200iX - Chapter 2 Installation

Dynojet 200iX
199 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-1
Above Ground Model 200iX/250iX Motorcycle Dynamometer Installation Guide
CHAPTER 2
I
NSTALLATION
This chapter will walk you through unpacking and installing the dynamometer. To
ensure safety and accuracy in the procedures, perform the procedures as they are
described.
This chapter is divided into the following categories:
Unpacking and Inspecting the Dyno, page 2-2
Dyno Installation, page 2-10
Battery, page 2-13
Pickup Card, page 2-14
Eddy Current Brake, page 2-15
Secure the Drum and Brake Module to the Floor, page 2-23
Remove the Dyno Covers, page 2-24
iX Drum Module Installation, page 2-25
Cable Routing, page 2-32
Side and Top Covers, page 2-40
Fan Arm Mounts, page 2-44
Trike Carriage Adapter and Carriage Assembly, page 2-45
Monitor Support and Tray, page 2-49
Control Panel and Cable, page 2-50
Final Adjustments and Tests, page 2-53
Zip Tube, page 2-55
Ground Hooks, page 2-56
Ramp Bracket, page 2-57

Table of Contents