Above Ground Model 200iX/250iX Motorcycle Dynamometer Installation Guide
Index-iv
compressed air 1-8
computer specifications 1-8
drill and drill bit 1-9
environmental 1-9
forklift 1-9
ground hooks 1-9
grounding 1-10
phone, internet access 1-10
tie-downs 1-10
right cover, iXW dyno E-16
routing cables
AFR power 2-33
air brake 3-4
air hose 2-33, 3-4
blower power extension 2-32
CAN control 2-33
CAN dyno user 2-33
CAN powersports 2-33
CAN termination plug 2-34
control panel 2-34
CPI to right blower 2-32
DynoWare RT power 2-32
e-stop 2-33
identifying cables 2-32
IR temp sensor 2-33
load cell 2-33
network 2-32
PCV CAN termination plug 2-34
pendant 2-32
power 2-12
power carriage 2-32
remote atmos 2-32
RPM pickup 2-32
speed pick up/brake 2-32
wheel clamp 2-32
RPM pickup 5-4–5-7
connecting 5-4–5-7
primary inductive pickup 5-5
secondary inductive pickup 5-6
RPM pickup cable 2-32
S
safety switch C-5
secondary inductive pickup 5-6
setting tool A-3
side cover
drum 2-31, E-13
dyno 2-24, 2-30, E-12
specifications 1-5–1-10
speed pick up cable 2-32
standard torque values
grade 5 F-2
grade 8 F-3
starter 5-11
using 4-6
status indicator 4-4, 4-7
support arm
installing 2-49
remove from crate 2-2
T
technical support 1-3
termination plug
CAN 2-34
PCV 2-34
testing
high pressure blowers 2-54
power carriage 2-54
trike carriage adapter 2-54
wheel clamp 2-54
testing voltages B-3, B-7
tie-down 2-44
tie-down straps 1-10, 5-3
tire carriage
remove from crate 2-2
tire lock 2-48
tire stop 2-48
toe kick bracket 2-30, E-12
top cover
dyno 2-24, 2-31, E-13
dyno drum 2-41, E-15
iX drum 2-42
iXW drum E-16
torque values
metric F-4
standard F-2
trike carriage adapter
base 2-45, 3-18
installing, extended 3-18
installing, standard 2-45
testing 2-54
V
vehicle ground cable 5-8
W
warnings vii
weight 1-5, E-2
wheel clamp
closing 4-8
connecting the cable 3-29
installing 3-27
maintenance 4-10
opening 4-8
routing cable 2-32
testing 2-54, 3-30
troubleshooting 4-10
using 4-7
width 1-5, E-2
woodruff key 2-27, E-8