8 SL4-SWD and SL7-SWD base modules for signal towers
8.4 Installation
SmartWire-DT module IP20 01/20 MN05006001Z-EN www.eaton.com 207
▶ Slide the base module onto the rapid mounting adapter in such a way
that the hole on the side of the base module is aligned with the lateral
screw on the rapid mounting adapter.
▶ Slide the securing ring over the base module and the rapid mounting
adapter a. The position of the marking on the base module and the posi-
tion of the marking on the securing ring must match b.
▶ Turn the securing ring clockwise an eighth of a turn (35 degrees) c.
The base module is now secured in place. The rapid mounting adapter's lat-
eral screw will now be accessible.
▶ Lock the securing ring into position by screwing out the screw on the
rapid mounting adapter d.
Figure 72: Attaching the base module on the rapid mounting adapter
→
For detailed instructions on how to connect the SWD4-8MF2
SmartWire-DT external device plug for the 8-pin SmartWire-DT
ribbon cable, please refer to the "Mount the SWD4-8MF2 blade
terminal" chapter in the "SmartWire-DT The system",
MN05006002Z manual.