EasyManua.ls Logo

Eaton SmartWire-DT SWD Series - Page 211

Eaton SmartWire-DT SWD Series
293 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 SL4-SWD and SL7-SWD base modules for signal towers
8.4 Installation
SmartWire-DT module IP20 01/20 MN05006001Z-EN www.eaton.com 207
Slide the base module onto the rapid mounting adapter in such a way
that the hole on the side of the base module is aligned with the lateral
screw on the rapid mounting adapter.
Slide the securing ring over the base module and the rapid mounting
adapter a. The position of the marking on the base module and the posi-
tion of the marking on the securing ring must match b.
Turn the securing ring clockwise an eighth of a turn (35 degrees) c.
The base module is now secured in place. The rapid mounting adapter's lat-
eral screw will now be accessible.
Lock the securing ring into position by screwing out the screw on the
rapid mounting adapter d.
Figure 72: Attaching the base module on the rapid mounting adapter
For detailed instructions on how to connect the SWD4-8MF2
SmartWire-DT external device plug for the 8-pin SmartWire-DT
ribbon cable, please refer to the "Mount the SWD4-8MF2 blade
terminal" chapter in the "SmartWire-DT The system",
MN05006002Z manual.
0.5 x 3.5
1
2
3
4

Table of Contents

Related product manuals