EasyManua.ls Logo

Epson C Series - Page 64

Epson C Series
668 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C4 Maintenance 4. Cable Unit
44 C Series Maintenance Manual Rev.2
53.
Install the battery board.
Hexagon socket head cap bolts: 2-M3×8
Tightening torque: 0.7 ± 0.05 N·m
54.
Install the connector to the battery board.
Connector: CN3
55.
* If you are not replacing the battery relay cable, go to the step (56).
If replacing the battery relay cable:
Install the connectors to the battery unit.
Connector: BT (2 connectors)
(The connectors can be installed on either side)
56.
Install the connectors to the battery board.
Connector: 2 connectors for the batteries, BT-CN1, BT-CN2, CN3
Wire tie: AB100
57.
Install the control board 1 to the Arm #1 and connect the connector.
Cross recessed head screws: 3-M3×8
Tightening torque: 0.45 ± 0.1 N·m
Connector: GS01
58.
Bind the cable protection spring (ø29, 130 mm) to the base cable
fixing plate.
Wire tie: AB100
Number of turns of spring to fix: 3 turns

Table of Contents

Related product manuals