EasyManua.ls Logo

EXFO Power Blazer - Page 205

EXFO Power Blazer
887 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Test Setup - Test Configurator, Timer, and System
Power Blazer 195
EtherSAM - Global
Ramp Test check box when selected (default):
In the first stage of the test, when CIR check box is selected (see
SLA Parameters on page 325), the throughput is increased
incrementally in steps until the CIR level is reached. During the first
stage, the maximum Jitter, Latency, Frame Loss, and throughput
are measured and are compared to the SLA thresholds to declare a
pass/fail verdict.
In the second stage of the test, when the CIR+EIR check box is
selected (see SLA Parameters on page 325), the throughput is
increased to the CIR+EIR level to compare against expected
maximum throughput threshold to declare a pass/fail verdict.
In the third stage of the test, when the Traffic Policing check box is
selected (see Test Parameters on page 324), the throughput is
increased one step over the CIR+EIR if selected otherwise over
the CIR to compare against expected maximum throughput
threshold to declare a pass/fail verdict.
The ramp test procedure is performed for each enabled service.

Table of Contents

Other manuals for EXFO Power Blazer

Related product manuals