EasyManua.ls Logo

EXFO Power Blazer - Summary (Link OAM)

EXFO Power Blazer
887 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Test Results
Power Blazer 567
Summary (Link OAM)
Summary (Link OAM)
From the Test menu, tap Results, and the Summary tab.
Test Status displays the current status of the Link OAM test. The global
test pass/fail verdict is displayed next to the Test Status when enabled
(see Pass/Fail Verdict on page 362).
Start Time Indicates the date and time the test was started. The date
and time is reset every time the test is restarted or reset.
Test Recover y, when displayed, indicates that the test has
automatically recovered from a power failure. The number of
occurrences is also displayed next to the Test Recover y field. Refer to
Power Failure Recovery on page 743.
Logger Full, when displayed, indicates that the logger is full. Refer to
Logger on page 493.
Alarms
Link OAM indicates that no OAM Information PDUs were received for 5
seconds.
Critical Event: Indicates that the OAM link partner has sent a critical
event notification (bit 2 of the Flags field is set to 1).
Test Status Description
-- The test is not running or results are not available.
In Progress The test is running.
Completed The test is completed, stopped at the planned time, or manually stopped when there is no
set timer.
Aborted The test is interrupted; stopped before the set timer.

Table of Contents

Other manuals for EXFO Power Blazer

Related product manuals