EasyManua.ls Logo

EXFO Power Blazer - Page 249

EXFO Power Blazer
887 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Test Setup - Test Configurator, Timer, and System
Power Blazer 239
Labels
VT/TU Path (V5): The V5 byte is allocated to indicate the content of the
VT/TU path, including the status of the mapped payloads.
Generated: Select the V5 byte from the list. Selecting a V5 byte value
will automatically update the OH V5 selection and vice versa. Refer to
V5 on page 677 for more information.
PLM-V/UNEQ-V / LP-PLM/LP-UNEQ: Enables the Payload Mismatch
and VT/TU UNEQ monitoring. This setting is coupled with the
configuration on the Labels on page 488.
Expected: Select the expected V5 byte from the list. Refer to V5 on
page 677 for more information.

Table of Contents

Other manuals for EXFO Power Blazer

Related product manuals