EasyManua.ls Logo

FP PostBase Vision - Page 151

FP PostBase Vision
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and care
151
Installing the rocker with moistening felt
The rocker features two clips that engage on
the two bolts at the sealer.
Fit the new rocker such that one leg of the
leg spring is located in the rocker groove
and the other leg in the sealer slot.
Hold sealer in place, and exerting moder-
ate pressure, push the rocker onto the
sealer such that the two clips engage on
the bolts.
Check
Check the correct seat:
The absorption felt must be perpendicu-
larly suspended in the liquid reservoir. Its
lower edge should roughly reach the bot-
tom.
The gap between rocker and sealer
housing must be uniform. (The rocker
must neither jut out nor touch the hous-
ing.)
Fill with SEALIT sealing liquid (see
page 148).
Connect the sealer to the postage meter
(see page 22).
Leg spring
Bolt
Clip
Absorption felt
Rocker
Uniform gap

Table of Contents

Other manuals for FP PostBase Vision

Related product manuals