Installation and commissioning
23
Fill sealer with SEALIT sealing liquid.
Check the filling level. The sealer should
be filled roughly up to the “max” mark.
Close the filling opening with the cover.
If necessary: Dry the sealer outside.
Step 4: Connecting the PostBase Vision
Caution! If the PostBase Vision was previ-
ously in a cold environment (i.e. below 50 °F /
10 °C): Wait at least 2 hours after unpacking
before connecting the postage meter. The
PostBase Vision needs this time to adjust to
the environmental conditions.
Caution! Do not connect the PostBase Vision
Feeder (the optional automatic feeder) until
Step 7. The PostBase Vision postage meter
must be fully installed to do this. Otherwise
the Feeder will not be recognized by the post-
age meter. The mailing system will not work.