EasyManua.ls Logo

FP PostBase Vision - Step 3: Assembling the Sealer (Optional)

FP PostBase Vision
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PostBase Vision
22
Step 3: Assembling the sealer (optional)
The sealer is positioned to the left of the
postage meter instead of the hand feed tray.
The catches on the right side of the sealer
and slots (on the left side of the bottom side
of the postage meter) mechanically couple
the two components and fasten them in
position relative to each other.
Assembling the sealer
Place the sealer to the left of the postage
meter.
Gently lift the postage meter on the left side
and push the sealer towards the postage
meter so that the front sides are flush.
Carefully lower the postage meter so that
the catches of the sealer engage in the
slots on the bottom side of the postage
meter.
Filling with sealing liquid
Swivel the cover of the filling opening to the
side.

Table of Contents

Other manuals for FP PostBase Vision

Related product manuals