EasyManua.ls Logo

FP PostBase Vision - Step 2: Assembling the PostBase Vision

FP PostBase Vision
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PostBase Vision
20
Step 2: Assembling the PostBase Vision
Installation site The installation site for the PostBase Vision
mailing system must meet the following
requirements:
Firm, level, low vibration and horizontal
base, which offers sufficient space for the
mailing system in the ordered version.
The dimensions of the individual compo-
nents can be found at page 177.
Room temperature in the range from 59 °F
to 95 °F / 15 °C to 35 °C.
No direct sunlight.
Relative humidity within a range of 15 % to
80 %, non-condensing.
Power socket in the immediate vicinity.
Network connection with internet access.
The PostBase Vision postage meter must
be placed on a suitable surface.
Remove the protective film from the
display.
Assembling the weighing platform
Hold the weighing platform as shown in
the illustration and place it onto the scale
receptacle. The long slot in the foot of the
weighing platform must slide in the coun-
terpart on the scale receptacle.
Long slot

Table of Contents

Other manuals for FP PostBase Vision

Related product manuals