EasyManua.ls Logo

FP PostBase Vision - Page 19

FP PostBase Vision
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and commissioning
19
Optional, only if ordered separately
PostBase Vision Feeder
(2 boxes)
Drop Stacker
(1 box, not illustrated)
The delivery package of the Drop Stacker is
shown and listed in the installation instruc-
tions which come together with the Drop
Stacker.
1
3
4
5
6
2
1 Feeder (automatic feeder with sealer)
2 Power cable
3 Bottle of SEALIT (sealing liquid)
4 Replacement sponge holder with sponge
5 Ramp
6 Pendulum

Table of Contents

Other manuals for FP PostBase Vision

Related product manuals