EasyManua.ls Logo

Fujitsu Airstage V series - Resistor, Cement; Reactor

Fujitsu Airstage V series
322 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICE PARTS INFORMATION 13
Resistor, Cement
Check Point 1 : Appearance check
Check Point 2 : Electric check
Set the tester to the "Resistance" mode, and measure the resistance value between the terminals.
(No polarity)
Judge the result of as follows:
5.32 to 5.88 : Normal
Other than the above : Deteriorated, defective
No fissures, breaks, damage, etc. at the body and terminals section?
1. Surge prevention resistor (connected to power relay)
06-106
SERVICE PARTS INFORMATION 14
Reactor
Check Point 1 : Appearance check
Check Point 2 : Electric check
Set the tester to the "Resistance" mode, and check for open/short between both ends of the reactor wire
(or connector).
Judge the result of as follows:
Short : Normal
Open : Abnormal (open)
No fissures, breaks, damage, etc. at the body and winding section, terminals section?

Table of Contents

Related product manuals