Page 157 Issue 08/2013
Commissioning
13 Commissioning
The start-up of the system and the inspection of the correct function must be
conrmed by the responsible person by lling out this commissioning report
in full
Installed system Rated power (8, 13, 17, 20, 25or 30kW) kW
Construction
type
One Unit External Unit
ID number generator
Serial number of the generator
Assembly SK Serial number switch box
Installed
magneticplate
Manufacturer
Type
Rated current A Nominal voltage V
Permissible cyclic
duration factor
%
MMI version Standard version Stand-Alone
Radio modem
Customer-specic
version
(description, number)
Voltage supply
MMI
System-specic power supply via generator
For external power supply only:
Voltage source:
Activated by:
fuse data
Installation site of fuse
Customer data Excavator type:
Customer/user
Commissioning
carried out and
check the correct
function
Date:
Company/Name:

Table of Contents