Figure 7 At t ach rails to switch 2824
2. Insert t wo of the pan-head screws through the slide rail and into the switch at the front of the
switch. Tighten the screws.
3. Insert t wo of the pan-head screws through the appropriate holes in the slide rail and into the switch
at the back of the switch. Tighten the screws.
4. Perform these steps again to Install the other rail on the other side of the node.
Install sw
itch 2824 in rack
1. Align the rails on the appliance with the rails in the rack.
2. Slidetheappliancefullyintotherack.
The rails
on the appliance will lock into the rails on the rack.
3. On each side of the switch, insert an MS screw through the holes in the rail and into the holes
in the rack.
4. Tighten
theMSscrewstosecuretheswitchtotherack.
Installing VLS300 cables
To install VLS300 cables, follow the instructions below.
1. On the primary node of the VLS300:
30
Hardware installation