● Packaging materials, for example, an ESD bag
● Phillips screwdriver
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see 1 Safety Instructions.
Step 2 Press the release button that secures the ejector lever. See step (1) in Figure 5-81.
The ejector lever automatically ejects.
Figure 5-81 Pulling out a hard disk enclosure
Step 3 Pull out the hard disk enclosure by holding the ejector lever. See step (2) in Figure
5-81.
Step 4 Loosen the screws on the hard disk indicator panel. See step (1) in Figure 5-82.
Step 5 Remove the hard disk indicator panel. See step (2) in Figure 5-82.
RH8100 V3 Server
User Guide 5 Removing and Installing Parts of the RH8100 V3
Issue 30 (2019-12-19) Copyright © Huawei Technologies Co., Ltd. 198