LeeBoy 6150 Conveyor Paver 5-3
Maintenance
Table 5-1. Periodic Maintenance Schedule
SYSTEM ITEM
Every 10 Hours
Daily
Every 50 Hours
Weekly
Every 100 Hours
Monthly
Every 250 Hours
Quarterly
Every 500 Hours
Semi-Annually
Every 1000
Hours Annually
Paver
Lubricate paver. X
Check tires. X
Engine
Check oil level. X
Check coolant level. X
Replace coolant. X
Check air lter. X
Change air lters. X
Replace fuel lter. X
Change oil and oil lter. (Initial 50 Hours) X
Check main engine belt. X
Hydraulic
Check hydraulic oil level. X
Change hydraulic oil. X
Change hydraulic lter. X
Check torque hub oil. X
Change torque hub oil. X
Drain hydraulic tank. Replace strainer. X
Mechanical
Adjust conveyor drive chains. X
Adjust conveyor ight chains. X
Adjust auger chains. X
Adjust screed extension top guide. X
operating condition, providing years of trouble-free
operation. Refer to the Engine Operator’s and any other
manuals accompanying your paver for more detailed
engine service information.
When performing any routine maintenance, always
include the previous routine maintenance hours in the
higher hourly schedule.
Changing oil and cleaning the paver
should only be done in a designated area where
the oil and chemicals can be contained. These by-
products should be discarded in accordance with
environmental regulations.
Maintenance Schedule
Before performing any maintenance procedures on the
LeeBoy Model 6150 Conveyor Paver, review the safety
information in Section 1.
Always use the appropriate tools
for the task at hand to prevent damage or possible
injury.
Always wear heat-resistant gloves
when handling hot components.
Following the maintenance schedules and procedures
along with cleaning daily will maintain the paver in top