EasyManua.ls Logo

LeeBoy 6150 - Spray down

LeeBoy 6150
400 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SPRAY DOWN
NOTE FOR
PRIMING PUMP:
pump is
spraying
pump is in
stand-by mode
pump is
priming
pump has
voltage error
pump has timed
out for no fluid.
cycle power
to reset.
pump has error
see manual for
troubleshooting
Pump Lights
LED lights located on
top of the pressure switch.
Bleeder
Valve
Screw
If necessary, raise the
screed all the way to
the up position to assist
with priming. If the pump
does not prime, loosen
the bleeder valve screw
inside of the cut out
until the pump primes,
then tighten the
bleeder valve screw.
SPRAYDOWN PUMP
1016094
1
2
3
3
4
4
4
5,6,7
8
8
9
9
10
10
11 (2.50”)
12
13
13
14
14
15,16
17,18
15,16,17,18
19
9
9
20
9
9
9
20
21
23,24,17
22
25
26
27
28
11
11
11
Figure 7-18. Spray Down
Illustrated Parts List
LeeBoy 6150 Conveyor Paver7-42

Table of Contents

Related product manuals