Installation
Electrical installation
4.2.7 Power connections
4-23
L
EDSVS9332S-B EN 3.0
4.2.7 Power connections
Controller Preparations for the power connection
9321 ... 9326 Remove the covers of the power connections:
Unlatch to the front by gentle pressure.
Pull upwards (mains connection) or downwards (motor connection).
9327 ... 9332 Remove cover:
Loosen screws (X) (see Fig. 4-1).
Swing cover to the top and detach.
Take the assembly kit out of the interior of the controller.