Page 140
communication with each other. To perform this validation, open the panels and look
at the diagnostic LED’s. Depending on the panel type, the location of these LED’s may
vary. Look for the LED labeled "Master/Slave" or "CAN". The status of this LED could
be as follows:
• Blinking - Congratulations, cabinets are communicating successfully
• Off - Communication is not enabled. Check the Remote Node ID setting. (See
page 138)
• On Solid - Addressing Conflict or other communication error. Verify configuration of
all master and remote panels.
Conclusion
Once power circuits and low voltage inputs have been connected, and communication
between the remote panels and their master have been verified, this part of the setup
is complete.
The master control panel now has control over all inputs and relays. The relays act as
an extension of the master relays and the inputs act as an extension of the master
inputs. To complete the functional programming of your system, please reference
your Z-MAX User’s guide which details the remainder of the required programming.