Z-Max Advanced Programming & Systems Design Guide rac00-sdg
Revision A:11/2005 Page 173
Power-Up & Installation Verification Checklist
Prior to the application of power to your relay cabinet, all of the following steps must
have been successfully executed.
Inspect each relay load wiring for incomplete termination
Inspect each relay’s load wiring for terminals not completely tightened
With each relay in the off position, check for voltage between the Line & Load
terminals, there should be 0V.
Inspect all low voltage wiring and ensure that it is complete
Inspect control power wiring, ensure that it is complete
Confirm that any unused supply wires on the control power transformer have been
suitably capped
Confirm that all connected load wiring between the relay panel and it’s load has
been completed
Confirm that wiring between the cabinet and all low voltage devices has been
completed
Apply power to the cabinet
Confirm that the cabinet boots properly and return to the status "normal" screen
Set the Time & Date from the menu
Update system software with the latest available software from the website if
appropriate
Proceed to panel programming