EasyManuals Logo

Lucent Technologies CBX 3500 Installation Guide

Lucent Technologies CBX 3500
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #121 background imageLoading...
Page #121 background image
Beta Draft Confidential
Installing and Removing Modules
Installing or Replacing Power Supplies
CBX 500 Multiservice WAN Switch Hardware Installation Guide 4/5/036-25
When the IOP’s Good LED is blinking slowly, the NMS operator can synchronize the
IOP card. For instructions, see the B-STDX, CBX, and GX Getting Started User’s
Guide.
Installing or Replacing Power Supplies
Normally, you can install a power supply without powering down the switch. The
exception is the replacement of either power supply in a non-redundant configuration
(that is, there is no redundant power supply installed). In that case, you must shut the
switch down before installing the new power supply.
CBX 500 switches support both AC and DC power supplies.
Figure6-11onpage6-26shows the Power Distribution Unit for the AC power supply
module.
!
Caution Toggle the faulty power supply’s ON/STANDBY switch to STANDBY
before you remove the power supply from the switch.
Note Before replacing the power supply, see the section,“DC Power Supply
Warnings, in Chapter 2.

Table of Contents

Other manuals for Lucent Technologies CBX 3500

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lucent Technologies CBX 3500 and is the answer not in the manual?

Lucent Technologies CBX 3500 Specifications

General IconGeneral
BrandLucent Technologies
ModelCBX 3500
CategorySwitch
LanguageEnglish

Related product manuals