Determining the Operating Status
What’s Next?
Beta Draft Confidential
CBX 500 Multiservice WAN Switch Hardware Installation Guide 4/5/035-15
What’s Next?
After installing the hardware and powering up the switch, you must perform the
following tasks:
• Download the software configuration to the switch; see the B-STDX, CBX, and
GX Getting Started User’s Guide for instructions.
• Install and configure the NMS software; see the B-STDX, CBX, and GX Network
Management Station Installation Guide for instructions.