CBX 500 Multiservice WAN Switch Hardware Installation Guide 4/5/034-1
Beta Draft Confidential
4
Installing the CBX 500 Switch
This chapter describes, in the following topics, how to set up and install the CBX 500
switch:
• Required Installation Tools and Equipment
• Setting Up the Switch
• Connecting Cables to the Switch
• Connecting the Console
• Setting Up the NMS
• Connecting External Clock Inputs and Outputs
• Connecting Alarm Relays
Before You Begin
Verify that the following tasks (mostly from Chapter 3) are complete:
1. Selecting the installation site (see page 3-1).
2. Unpacking the switch (see page 3-3).
3. Unpacking the accessory kit (see page 3-4).
4. Verifying the module configuration in the switch (see page 3-5).
5. Gathering the tools and equipment needed for installation (see page 4-2).