Preparing for the Installation
This chapter describes the tasks that must be completed before installing the CBX 500
switch. These tasks include:
Selecting the Installation Site
Checking the Switch for Damage
Moving the Switch to the Installation Site
Unpacking the Switch
Unpacking the Accessory Kit
Verifying the Hardware Configuration
Selecting the Installation Site
Before you choose a setup location for the CBX 500 switch, read and follow the site
and electrical requirements defined in Chapter 2.
When selecting the setup location, you must ensure that the switch has adequate
ventilation and space for current and future cabling requirements. You can rack-mount
the CBX 500 switch in a standard 19- or 23-inch (48.26 or 58.42 cm) wide equipment
cabinet, or place it on a flat surface as a free-standing unit, as described in the section,
“Setting Up the Switch” in Chapter 4.

Table of Contents

Other manuals for Lucent Technologies CBX 3500

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lucent Technologies CBX 3500 and is the answer not in the manual?

Lucent Technologies CBX 3500 Specifications

General IconGeneral
BrandLucent Technologies
ModelCBX 3500
CategorySwitch
LanguageEnglish

Related product manuals